Menyenaraikan 221 hingga 240 daripada 309 dokumen yang dijumpai.
Bil. Tajuk Dokumen Terbitan Kluster Status Versi Ringkasan, Lampiran, dan Pautan
221 Submission of Building Plans by Architects to the Local Authorities (GC No.1/2020)

WA.1.2020.601
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 A joint Committee had been established between the Board of Architect Malaysia (BAM) and the Board of Engineers Malaysia (BEM) to review and to streamline the Appendices A, B and C with regards to submission of building plans by Architects to the local authorities. The review and streamlining took into consideration of the changes in the building typology and development trends.

222 Amendments to the Architects Rules 1996 (GC No.1/2023)

WA.1.2023.589
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This General Circular is issued to inform all registered members that the Architects Rules 1996had recently been amended. The amendments had been gazetted and come into force on 1st October 2022.

223 Pre-Qualification of Contractor For the Proposed Construction and completion of Infrastructure, Building and Public Realm (Phase 3) at Tun Razak Exchange ("TRX)

WC.2.2023.586
CIDB Lembaga Pembangunan Industri Pembinaan

Pengurusan Dasar Umum Berkuatkuasa TERBUKA Pre-Qualification of Contractor For the Proposed Construction and completion of Infrastructure, Building and Public Realm (Phase 3) at Tun Razak Exchange ("TRX)



224 Pindaan kepada Kaedah-Kaedah Arkitek 1996 (PA Bil.1/2023)

WA.1.2023.583
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 Pekeliling Am ini dikeluarkan untuk memaklumkan semua ahli berdaftar bahawa Kaedah-Kaedah Arkitek 1996 telah dipinda. Pindaan tersebut telah diwartakan dan mula berkuatkuasa pada 1 Oktober 2022.

225 Garispanduan mengenai Praktis Perundingan Seni Bina (PA Bil.2/2023)

WA.1.2023.572
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 Pekeliling Am ini dikeluarkan untuk memaklumkan semua Arkitek berdaftar dengan Lembaga Arkitek Malaysia (Lembaga) bahawa Kaedah 30A(3) telah diliputi di bawah pindaan Kaedah-Kaedah Arkitek 1996 yang telah diwartakan dan mula berkuatkuasa pada 1 Oktober 2022.

“(3) Dalam hal suatu pertubuhan perbadanan yang didaftarkan sebagai praktis perundingan seni bina yang mempunyai pengarah…

226 PERINTAH LEMBAA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (PENGENAAN LEVI) 2021

WC.1.2022.569
CIDB Lembaga Pembangunan Industri Pembinaan

Garis Panduan Berkuatkuasa TERBUKA PERINTAH LEMBAA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (PENGENAAN LEVI) 2021



227 TUNTUTAN UJIAN PENGESANAN COVID-19 DI FASILITI SWASTA OLEH PEGAWAI PERKHIDMATAN AWAM PERSEKUTUAN ATAS URUSAN TUGAS RASMI

WK.5.2021.566
KKR Kementerian Kerja Raya, BK Bahagian Kewangan

Pengurusan dan Pentadbiran Umum Arkib 1.0 Surat edaran berkaitan tuntutan pengesanan Covid-19 di fasiliti swasta oleh Pegawai Perkhidmatan Awam Persekutuan atas urusan tugas rasmi yang perlu dihantar ke Bahagian Kewangan, Kementerian Kerja Raya untuk kelulusan.

228 Guidelines on Architectural Consultancy Practice (GC No.2/2023)

WA.1.2023.563
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This General Circular is issued to inform all registered Architects with the Board of Architects Malaysia (the Board) that Rule 30A(3) has been incorporated under the amendment of Architects Rules 1996 which was gazetted and enforced on 1 October 2022.

“(3) In the case of a body corporate registered as an architectural consultancy practice having a single director, the director…

229 Garispanduan mengenai Surat Pelepasan (PA Bil.3/2023)

WA.1.2023.560
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 Pekeliling Am ini menggantikan Pekeliling Am Bil 2/2007 semasa mengenai Garis Panduan di atas.

230 Guidelines on Letter of Release (GC No.3/2023)

WA.1.2023.557
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This General Circular replaces the current General Circular No. 2/2007 pertaining to the above Guidelines.

231 PEMILIHAN AGENSI PENGEMBARA BAGI WARAN PENERBANGAN UDARA AWAM (WPUA)

WK.5.2021.554
KKR Kementerian Kerja Raya, BK Bahagian Kewangan

Pengurusan dan Pentadbiran Umum Berkuatkuasa 1.0 Surat edaran berkaitan pemilihan agensi pengembara bagi WPUA ditentukan secara penggiliran bagi mengelak berlakunya kecenderungan pemilihan agensi pengembara yang sama.

232 Garis Panduan Mengenai Pembangunan Profesional Berterusan (PA Bil.4/2023)

WA.1.2023.551
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 Pembangunan Profesional Berterusan (Continuing Professional Development - CPD) ialah proses pembelajaran sepanjang hayat bagi mengekalkan atau meningkatkan pengetahuan dan kemahiran ahli yang berdaftar dengan Lembaga Arkitek Malaysia yang terdiri daripada Arkitek, Arkitek Siswazah, Pelukis Pelan Bangunan Berdaftar, Perekabentuk Dalaman, Perekabentuk Dalaman Siswazah, Pemeriksa Tapak dan…

233 PENURUNAN KUASA PEGAWAI PENGAWAL MENGIKUT PEKELILING PERBENDAHARAAN WP 2.5 KEMUDAHAN PERJALANAN UDARA RASMI (TUNTUTAN BAYARAN BALIK)

WK.5.2021.548
KKR Kementerian Kerja Raya, BK Bahagian Kewangan

Pengurusan dan Pentadbiran Umum Arkib 1.0 Surat penurunan kuasa Pegawai Pengawal mengikut Pekeliling Perbendaharaan WP 2.5 Kemudahan Perjalanan Udara Rasmi (tuntutan bayaran balik)

234 KAWALAN DALAMAN BAGI PELAKSANAAN BENGKEL/KURSUS/ RETREAT OLEH KEMENTERIAN KERJA RAYA: PELAKSANAAN DI PREMIS HOTEL BERTARAF 4 BINTANG DAN KE BAWAH

WK.5.2019.540
KKR Kementerian Kerja Raya, BK Bahagian Kewangan

Pengurusan dan Pentadbiran Umum Berkuatkuasa 1.0 Surat berkaitan kawalam dalaman bagi pelaksanaan bengkel/ kursus/ retreat di premis hotel bertaraf 4 bintang dan ke bawah sahaja.

235 Standard Technical Specification Lift System

WJ.3.2017.531
JKR Jabatan Kerja Raya, CKM Cawangan Kejuruteraan Mekanikal

Standard dan Piawaian Berkuatkuasa 2017 All particulars of the Lift System as regards no. of lift, type, contract load, contract speed, travel of lift, number of floors and entrances served, lift car dimensions and area and position of Machine Rooms are as indicated in the Schedule of Equipment and/or tender drawing.

236 Guidelines On Continuing Professional Development (GC No.4/2023)

WA.1.2023.528
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 Continuing Professional Development (CPD) is a life-long learning process that maintains, enhances or increases the knowledge and skills of registered persons with the Board of Architects Malaysia consisting of Architects, Graduate Architects, registered Building Draughtsmen, Interior Designers and Graduate Interior Designers, Inspector of Works and Architectural Technologist to ensure their…

237 Internal Cold Water and Sanitary Plumbing System

WJ.3.2017.525
JKR Jabatan Kerja Raya, CKM Cawangan Kejuruteraan Mekanikal

Standard dan Piawaian Berkuatkuasa 2017 Internal Cold Water and Sanitary Plumbing System
The work to be performed under this contract shall comprise, but not limited to the supply, delivery, installation, testing and commissioning and maintenance of the following principal services and the associated works and items.

238 Spesifikasi Teknikal Piawai: Sistem Bekalan Air Sejuk Dalaman dan Perpaipan Sanitari

WJ.3.2011.517
JKR Jabatan Kerja Raya, CKM Cawangan Kejuruteraan Mekanikal

Standard dan Piawaian Berkuatkuasa 2011 Spesifikasi Teknikal Piawai: Sistem Bekalan Air Sejuk Dalaman dan Perpaipan Sanitari
The work to be performed under this contract shall comprise, but not limited to the supply, delivery, installation, testing and commissioning and maintenance of the following principal services and the associated minors works and items.

239 KKR-PK-05 PROSEDUR PENYEDIAAN CADANGAN ANGGARAN PERBELANJAAN MENGURUS

WK.3.2023.501
KKR Kementerian Kerja Raya, BK Bahagian Kewangan

Standard dan Piawaian Berkuatkuasa 1 Prosedur ini digunapakai oleh Kementerian Kerja Raya di dalam menyediakan Cadangan Anggaran Perbelanjaan Mengurus

240 KKR-PK-06 PROSEDUR BAYARAN

WK.3.2023.492
KKR Kementerian Kerja Raya, BK Bahagian Kewangan

Standard dan Piawaian Berkuatkuasa 3 Prosedur ini digunapakai oleh semua Pusat Tanggungjawab (PTJ) di bawah Kementerian Kerja Raya iaitu Bahagian Perancang Jalan, Bahagian Khidmat Pengurusan, Bahagian Kewangan, Bahagian Pembangunan dan Penswastaan, Bahagian Akaun dan Bahagian Pengurusan Fasiliti.