Menyenaraikan 1 hingga 20 daripada 309 dokumen yang dijumpai.
Bil. Tajuk Dokumen Terbitan Kluster Status Versi Ringkasan, Lampiran, dan Pautan
1 GARIS PANDUAN PROSES KELULUSAN PEMBAYARAN MELALUI iGFMAS BAGI: (A) INVOIS TANPA PESANAN KERAJAAN (ITPK) DALAM PEROLEHAN BEKALAN DAN PERKHIDMATAN (B) INDEN KERAJAAN DALAM PEROLEHAN KERJA KKR Kementerian Kerja Raya, BK Bahagian Kewangan

Garis Panduan Berkuatkuasa 3.0 Pelaksanaan Proses Kelulusan Pembayaran melalui iGFMAS bagi
i. Invois Tanpa Pesanan Kerajaan (ITPK) dalam Perolehan bekalan dan perkhidmatan; dan
ii. Inden Kerajaan dalam Perolehan Kerja.

2 Dasar Keselamatan ICT (DKICT) Kementerian Kerja Raya (KKR)

WK.2.2022.2789
KKR Kementerian Kerja Raya, BPM Bahagian Pengurusan Maklumat

Pengurusan Dasar Umum Berkuatkuasa 4.1 Dasar Keselamatan ICT (DKICT) Kementerian Kerja Raya (KKR) mengandungi peraturanperaturan yang mesti dibaca dan dipatuhi dalam menggunakan aset ICT. Peraturanperaturan ini perlu difahami dan dipatuhi oleh semua pengguna di KKR. Dasar ini juga menerangkan kepada semua pengguna mengenai tanggungjawab dan peranan mereka dalam melindungi aset ICT KKR.

3 DASAR PEMBINAAN NEGARA (NATIONAL CONSTRUCTION POLICY-NCP) 2030

WK.2.2021.2786
KKR Kementerian Kerja Raya, BDA Bahagian Dasar dan Antarabangsa

Pengurusan Dasar Umum Berkuatkuasa 1 YB Menteri Kerja Raya telah melancarkan Dasar Pembinaan Negara 2030 (NCP2030) yang bertemakan 'Mendigitalkan Sektor Pembinaan' pada 9 November 2021. Bagi memastikan anjakan paradigma dalam sektor pembinaan, Dasar Pembinaan Negara 2030 bertujuan untuk mempercepatkan pengadapatasian teknologi dalam semua proses kerja sebelum, semasa dan selepas dalam kitaran lengkap pembinaan dengan…

4 JADUAL KADAR KERJA KEJURUTERAAN AWAM DAN BANGUNAN TAHUN 2021

WJ.1.2021.2770
JKR Jabatan Kerja Raya, CKUB Cawangan Kontrak dan Ukur Bahan

Garis Panduan Berkuatkuasa 2021 JADUAL KADAR KERJA KEJURUTERAAN AWAM DAN BANGUNAN TAHUN 2021

5 INSPECTION AND TESTING PLAN 3RD EDITION 2015: VERSION 2 GARIS PANDUAN BAGI KERJA-KERJA UNTUK PROJEK JKR

WJ.1.2015.2621
JKR Jabatan Kerja Raya, CKE Cawangan Kejuruteraan Elektrik

Garis Panduan Berkuatkuasa 2015 Dokumen ITP ini merupakan dokumen rujukan dan dokumen sokongan bagi membantu staf JKR di dalam melaksanakan projek dan ia tidak terikat dengan peraturan kontrak. ITP bagi pelaksanaan projek yang dinyatakan di dalam SPB JKR di mana kontraktor perlu mengemukakan Senarai ITP di dalam C-Plan. Walau bagaimanapun, pembangunan ITP ini adalah untuk membantu staf JKR dan sebagai panduan bagi menyemak ITP…

6 Circular No. 003: For Submission of Sewerage and Sanitary Plumbing Works (Rev. No.: 1)

WJ.4.2017.1656
BEM Lembaga Jurutera Malaysia

Peraturan dan Kaedah Berkuatkuasa Circular No. 003: For Submission of Sewerage and Sanitary Plumbing Works (Rev. No.: 1) Sanitary plumbing works shall be submitted by registered Professional Engineers with Practising Certificate in the Mechanical or Civil disciplines.
Septic tanks and sewerage treatment plant including associated structural works shall be submitted by registered Professional Engineers with Practising Certificate in the Civil discipline only.



7 Mengemukakan Pelan "Sanitary and Plumbing"

WJ.4.1985.1653
BEM Lembaga Jurutera Malaysia

Peraturan dan Kaedah Arkib Mengemukakan Pelan "Sanitary and Plumbing" (Ref. No.: (81) dlm. LJM 28 Jld 2) Sanitary plumbing works shall be submitted by registered Professional Engineers with Practising Certificate in the Mechanical or Civil disciplines.
Septic tanks and sewerage treatment plant including associated structural works shall be submitted by registered Professional Engineers with Practising Certificate in the Civil discipline only.

8 Circular No. 5/2005: General Advice On Giving Of Second Opinion

WJ.4.2005.1650
BEM Lembaga Jurutera Malaysia

Peraturan dan Kaedah Berkuatkuasa Circular No. 5/2005: General Advice On Giving Of Second Opinion (Rev. No.: 0) It is not common for an engineer to offer to a project owner unsolicited suggestion or proposal on the design which has been, or is being, carried out by another engineer already appointed by the owner to be the consulting engineer for the project.
Quite commonly, such suggestion or proposal deals with the choice of engineering system (structural, geotechnical, etc.) or the so-called…



9 Circular No. 002: Continuing Professional Development (CPD) Requirements (Rev. No. 0)

WJ.4.2017.1646
BEM Lembaga Jurutera Malaysia

Peraturan dan Kaedah Arkib Continuing Professional Development (CPD) Requirements (Rev. No.: 0) The BEM in performing its functions under Section 4(1)(ec) of Act 138 Registration of Engineers Act 1967 (Revised up to 2015) has caused a mandatory Continuing Professional Development (CPD) Programme to be undertaken by all Registered Professional Engineers with Practising Certificates, Registered Professional Engineers and Registered Inspectors of Works.

This Circular states the…

10 Circular No. 002: Continuing Professional Development (CPD) Requirements (Rev. No. 1)

WJ.4.2021.1643
BEM Lembaga Jurutera Malaysia

Peraturan dan Kaedah Berkuatkuasa Continuing Professional Development (CPD) Requirements (Rev. No.: 1) The BEM in performing its functions under Section 4(1)(ec) of Act 138 Registration of Engineers Act 1967 (Revised up to 2015) has caused a mandatory Continuing Professional Development (CPD) Programme to be undertaken by all Registered Professional Engineers
with Practising Certificates, Registered Professional Engineers and Registered Inspectors
of Works.
This Circular…



11 Circular No. 3/2005: Guidelines for Code of Professional Conduct

WJ.4.2004.1640
BEM Lembaga Jurutera Malaysia

Peraturan dan Kaedah Arkib Code of Professional Conduct (Rev. No.: 0) Guidelines of code of professional conduct.

12 Circular No. 001: Code of Conduct of Registered Person

WJ.4.2016.1637
BEM Lembaga Jurutera Malaysia

Peraturan dan Kaedah Berkuatkuasa Code of Conduct of Registered Person (Rev. No.: 1) This Code of Conduct is in addition to Part IV, Code of Conduct of the Registration of Engineers Regulations 1990.



13 SURAT PEKELILING CIDB BIL. 6/2023 - PEKELILING PENSTRUKTURAN DAN PENETAPAN SYARAT PENDAFTARAN KONTRAKTOR FASILITI

WC.1.2024.1485
CIDB Lembaga Pembangunan Industri Pembinaan

Garis Panduan Berkuatkuasa Versi Pertama SURAT PEKELILING CIDB BIL. 6/2023 - PEKELILING PENSTRUKTURAN DAN PENETAPAN SYARAT PENDAFTARAN KONTRAKTOR FASILITI

14 Status Reports on Applications to Local Authorities - GC No.4/1997

WA.1.2006.1482
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 The Board wishes to refer to its General Circular No. 4/1997 dated 9 December 1997 on the requirements to submit to the Board every 6 months a report on all applications submitted to the local authorities for approval. The required information is as shown in the Forms A1 and A2 as stipulated.

15 Guidelines on Advertising by Architects - GC No.3/1997

WA.1.1997.1479
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 These guidelines are issued pursuant to the provisions in the Code of Conduct for Architects under the Architects Rules 1996 to elaborate on and provide guidance to Architects on various activities which may be deemed to be described as “advertising".

16 Notification to the Board of a Change in Address (Building Draughtsmen) - GC No.2/1989

WA.1.1989.1476
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 All registered Building Draughtsmen are reminded that under Section 23 of the Architects Act 1967, they are required to inform the Board of any change of their business addresses.

17 Notification to the Board of a Change in Address - GC No.1/1989

WA.1.1989.1473
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 All registered Architects and Architectural Graduates are reminded that under Section 14 of the Architects Act 1967, they are required to inform the Board of any change of their business addresses.

18 Certification or Signing of Plans by registered Building Draughtsmen - GC No.5/1988

WA.1.1988.1470
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 All registered Building Draughtsmen are hereby informed that the following requirements of the Board shall be applicable with immediate effect :

19 Reminder to Registered Building Draughtsmen on Certificates of Progress of Works - GC No.1/1988

WA.1.1988.1467
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This Circular is issued to all registered Building Draughtsmen following the increase in the number of complaints received by the Board lately pertaining to wrongful certification of the stage of completion of projects by registered Building Draughtsmen.

20 Clarification on The Provision of Section 24(5)(i) and Section 24(5) (ii) of The Architects Act 1967 - GC No.6/1986

WA.1.1986.1464
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This Circular is issued in response to the queries received by the Board of Architects Malaysia relating to the submission of plans by registered Building Draughtsmen to the various local building authorities for approval. The most common query relates to the provisions under Sections 24(5) (i) and 24(5) (ii) of the Architects Act, 1967 (Revised 1973).