Menyenaraikan 21 hingga 40 daripada 309 dokumen yang dijumpai.
Bil. Tajuk Dokumen Terbitan Kluster Status Versi Ringkasan, Lampiran, dan Pautan
21 Registration of Building Draughtsmen and Their Areas of Operation - GC No.5/1986

WA.1.1986.1461
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 Applications for registration as registered Building Draughtsmen under Section 22 of the Architects Act 1967 (Revised 1973).

22 The Use of Standard Rubber Stamp by Registered Building Draughtsmen - GC No.2/1985

WA.1.1985.1458
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 It has been noticed that certain registered Building Draughtsmen have inaccurately described their designations as registered persons with the Board. To overcome this problem as well as for the purpose of uniformity, the Board has decided that a standard design rubber stamp be used by all registered Building Draughtsmen. The sample of the fullsize standard rubber stamp is as shown below.

23 INTERPRETATION OF SECTION 24(5) of the Architects Act, 1967 (Revised 1973) relating to the definitions of "storeys of buildings" and "built-up areas of buildings"

WA.1.1985.1455
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 For the guidance of all Registered Building Draughtsmen and Building Authorities, the Board has interpreted and clarified the two definitions affecting the restrictions on Registered Building Draughtsmen in the submission of plans

24 Warning for the Possible Breach of The Architects Act 1967 - GC No.2/1984

WA.1.1984.1452
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 Lately, the Board has come across a number of cases whereby Registered Buildinq Draughtsmen have failed to comply with the provisions of the Architects Act 1967 (Revised 1973) in carrying out their practice with particular reference to Section 7 and Section 24 of the Act which are extracted and reprinted below for easy reference.

25 Guidelines for Names of Firms and Letterheads for Registered Building Draughtsmen - GC No.2/1983

WA.1.1983.1449
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 The Board has become increasingly concerned over the inventiveness of Building Draughtsmen in naming their practices which either do not accurately reflect their origins or compositions.

It has therefore been decided that any Building Draughtsman wishing to name a firm or to print his letterhead will be required to submit his proposal to the Board for prior approval. This…

26 Violations of the Code of Professional Conduct as a result of Economic Pressure - GC No.1/1999

WA.1.1999.1446
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 It has come to the Board's notice that there are a number of end-users who are capitalising on the current economic situation by exploiting Architects, which if left unchecked, will seriously damage the long-term future of the entire profession.

27 ARCHITECTURAL EXAMINATION COUNCIL MALAYSIA - GC No.3/2001

WA.1.2001.1443
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 The Architectural Examination Council Malaysia has been established pursuant to Section 4(1)(ga) of the Architects Act 1967. This Council is responsible to conduct examinations for admission to enter the architectural profession in Malaysia.

28 Issues Pertaining to the Architectural Profession - GC No.2/2001

WA.1.2001.1440
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 In March 2001, the Board of Architects Malaysia has submitted a Memorandum to the Ministry of Finance Malaysia which contains three (3) issues.

29 ARCHITECT’S CERTIFICATION UNDER THE STANDARD SALE AND PURCHASE AGREEMENTS - GC No.2/2002

WA.1.2002.1437
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 The Board finds it necessary to issue this General Circular which follows on General Circular No. 1/2001.

This is because even within the first month of the new year, the Board has received information that is of extremely serious concern to the profession. The information relates to the incorrect or apparently fraudulent certification by Architects that will have far-reaching…

30 GUIDELINES ON THE THIRD SCHEDULE [CLAUSE 4(1)] OF THE STANDARD SALE AND PURCHASE AGREEMENT FOR LAND AND BUILDING/ GUIDELINES ON THE THIRD SCHEDULE [CLAUSE 4(1)] OF THE STANDARD SALE AND PURCHASE AGREEMENT FOR SUB-DIVIDED BUILDING

WA.1.2005.1434
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 The Guidelines which have been issued vide the Board’s General Circular No. 4/2003 dated 15 December 2003 have taken into consideration the amendments to the Housing Development (Control and Licensing) Regulations 1989 which came into force from 1 December 2002. All Professional Architects have been advised to be familiar with
these Guidelines before certifying works in respect of housing…

31 Guidelines on Architectural Consultancy Practices - GC No.2/2004

WA.1.2004.1431
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 An Act to amend the Architects Act 1967 cited as the Architects (Amendment) Act 2002 introduced, among others, a new section 7B pertaining to the registration of a body corporate providing architectural consultancy services, professional engineering services and/or quantity surveying services (hereinafter referred to as ‘multi-disciplinary practices’ or ‘MDP’).

32 GUIDELINES ON LETTER OF RELEASE - GC No.2/2007

WA.1.2007.1428
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This General Circular replaces the current General Circular No. 1/1998 pertaining to the above Guidelines.

A Professional Architect on being approached or instructed to proceed with professional work for which he knows or can ascertain by making reasonable enquiries that another Professional Architect has been engaged by the registered proprietor (Note 1) and/or his bona-fide agent…

33 Use of Standard Rubber Stamp by Interior Designers - GC No.6/2010

WA.1.2010.1425
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 The Board of Architects Malaysia (LAM) has decided that all Interior Designers shall use a standard rubber stamp specified by LAM for the purpose of standardization.

34 Guidelines on Branch Office and Associated Practice - GC No.3/2010

WA.1.2010.1422
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 Paragraph 2(2) of the Code of Professional Conduct for Professional Architects under Second Schedule to the Architects Rules 1996 stipulates the following :
“A Professional Architect shall not establish a branch office unless it is operated in accordance with the guidelines or circulars issued by the Board.”

35 Guidelines on Issuance of FORM F1 (Partial Certificate of Completion and Compliance) - GC No.2/2010

WA.1.2010.1419
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This GC is issued to provide guidance to Professional Architects on the issuance of Form F1 i.e. the Partial Certificate of Completion and Compliance.

36 Registration of Interior Design Consultancy Practice - GC No.1/2010

WA.1.2010.1416
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This GC is issued as guidelines pertaining to the formation and registration of interior design consultancy practice.

37 GUIDELINES ON THE THIRD SCHEDULE [CLAUSE 4(1)] OF THE STANDARD SALE AND PURCHASE AGREEMENT FOR LAND AND BUILDING/GUIDELINES ON THE THIRD SCHEDULE [CLAUSE 4(1)] OF THE STANDARD SALE AND PURCHASE AGREEMENT FOR SUB-DIVIDED BUILDING

WA.1.2008.1413
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 The Ministry of Housing and Local Government had, on 17 June 2008, gazetted the Housing Development (Control and Licensing) (Amendment) Regulations 2008 which shall be deemed to have come into operation on 1 December 2007. The recent Regulation was gazetted to rectify the error in the previous Housing Development (Control and Licensing) (Amendment) Regulations 2007.

38 Guidelines on Architectural Competition - GC No.2/2005 (Revised 2008)

WA.1.2008.1410
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 These Guidelines are issued pursuant to the provisions of the Code of Professional Conduct for Professional Architects to elaborate and provide guidance relating to architectural competitions.

39 PROVISION OF FREE OR VIRTUALLY FREE SERVICES - GC No.1/1997

WA.1.1997.1405
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 It has come to the Board's attention recently that there have been a number of instances of Architects having been invited to submit conceptual or other proposals for development projects either without any cost or obligation whatsoever on the part of the party wishing to obtain proposal. The Board feels it advisable to issue this Advisory for the information and guidance of Architects.

40 SUBMISSION OF PLANS BY ARCHITECTS AND ENGINEERS - GC No.4/1989

WA.1.1989.1402
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This is to inform all Architects that a Joint Committee has recently been established between the Board of Architects Malaysia (BAM) and the Board of Engineers Malaysia (BEM) to discuss the above. Discussions will be centred mainly on the list of works in 'Appendix C' of the letter issued by the Joint BAM-BEM Committee to all local authorities in 1979. For your information, the said…