Menyenaraikan 61 hingga 80 daripada 363 dokumen yang dijumpai.
Bil. | Tajuk Dokumen | Terbitan | Kluster | Status | Versi | Ringkasan, Lampiran, dan Pautan |
---|---|---|---|---|---|---|
61 | Pelan-pelan Engineering Survey WJ.2.1982.4224 |
BEM Lembaga Jurutera Malaysia |
Pengurusan Dasar Umum | Arkib | 0002(A) Pelan-pelan Engineering Survey | Pelan-pelan Engineering Survey |
62 | CIS 24 : 2018 IBS MANUFACTURER & PRODUCT ASSESSMENT & CERTIFICATION (IMPACT) WC.3.2018.4213 |
CIDB Lembaga Pembangunan Industri Pembinaan |
Standard dan Piawaian | Berkuatkuasa | VERSI PERTAMA | CIS 24 : 2018 IBS MANUFACTURER & PRODUCT ASSESSMENT & CERTIFICATION (IMPACT) |
63 | CIS 19 : QUALITY ASSESSMENT SYSTEM FOR COMPLETED ROAD WORKS WC.3.2011.4200 |
CIDB Lembaga Pembangunan Industri Pembinaan |
Standard dan Piawaian | Berkuatkuasa | VERSI PERTAMA | CIS 19 : QUALITY ASSESSMENT SYSTEM FOR COMPLETED ROAD WORKS |
64 | CIS 5:2004 QUALITY ASSURANCE FOR PREFABRICATED TIMBER TRUSS SYSTEMS WC.1.2005.4178 |
CIDB Lembaga Pembangunan Industri Pembinaan |
Standard dan Piawaian | Berkuatkuasa | VERSI PERTAMA | CIS 5:2004 QUALITY ASSURANCE FOR PREFABRICATED TIMBER TRUSS SYSTEMS |
65 | Interim Guide on IDENTIFYING, PRIORITISING AND TREATING HAZARDOUS LOCATIONS ON ROADS IN MALAYSIA | JKR Jabatan Kerja Raya |
Garis Panduan | Berkuatkuasa | 1995 | This interim guide provides information specifically for Malaysia and sets out a standard methodology for analysing accident data to help identify the most hazardous locations select appropriate remedial measures, and evaluate this action. It is my hope that this Guide will be useful to all who are involved in the road safety field, helping them to channel limited resources in a more efficient… |
66 | SURAT EDARAN PENGUATKUASAAN ARAHAN TIDAK MEMBENARKAN PENERIMAAN POST-DATED CHEQUE DAN CEK PERSENDIRIAN BAGI TRANSAKSI TERIMAAN KERAJAAN DI KEMENTERIAN KERJA RAYA (KKR) DAN JABATAN KERJA RAYA (JKR) | KKR Kementerian Kerja Raya, BA Bahagian Akaun |
Garis Panduan | Berkuatkuasa | AP 76(a) dan APANM Bil.3/2019 | Penguatkuasaan arahan untuk tidak membenarkan penerimaan "Post-Date Cheque" dan cek persendirian bagi transaksi terimaan kerajaan di semua PTJ Kementerian Kerja Raya dan Jabatan Kerja Raya. |
67 | GARIS PANDUAN PROSES PULANGAN BALIK ATAU PELARASAN AKAUN DEPOSIT WANG JAMINAN PELAKSANAAN (WJP) | KKR Kementerian Kerja Raya, BA Bahagian Akaun |
Garis Panduan | Berkuatkuasa | 6.5 & 6.7 | Garis Panduan Proses Pulangan Balik atau Pelarasan Akaun Deposit Wang Jaminan Pelaksanaan (WJP) . |
68 | Dasar Keselamatan ICT (DKICT) Kementerian Kerja Raya (KKR) WK.2.2022.2789 |
KKR Kementerian Kerja Raya, BPM Bahagian Pengurusan Maklumat |
Pengurusan Dasar Umum | Berkuatkuasa | 4.1 | Dasar Keselamatan ICT (DKICT) Kementerian Kerja Raya (KKR) mengandungi peraturanperaturan yang mesti dibaca dan dipatuhi dalam menggunakan aset ICT. Peraturanperaturan ini perlu difahami dan dipatuhi oleh semua pengguna di KKR. Dasar ini juga menerangkan kepada semua pengguna mengenai tanggungjawab dan peranan mereka dalam melindungi aset ICT KKR.
|
69 | DASAR PEMBINAAN NEGARA (NATIONAL CONSTRUCTION POLICY-NCP) 2030 WK.2.2021.2786 |
KKR Kementerian Kerja Raya, BDA Bahagian Dasar dan Antarabangsa |
Pengurusan Dasar Umum | Berkuatkuasa | 1 | YB Menteri Kerja Raya telah melancarkan Dasar Pembinaan Negara 2030 (NCP2030) yang bertemakan 'Mendigitalkan Sektor Pembinaan' pada 9 November 2021. Bagi memastikan anjakan paradigma dalam sektor pembinaan, Dasar Pembinaan Negara 2030 bertujuan untuk mempercepatkan pengadapatasian teknologi dalam semua proses kerja sebelum, semasa dan selepas dalam kitaran lengkap pembinaan dengan… |
70 | Circular No. 003: For Submission of Sewerage and Sanitary Plumbing Works (Rev. No.: 1) WJ.4.2017.1656 |
BEM Lembaga Jurutera Malaysia |
Peraturan dan Kaedah | Berkuatkuasa | Circular No. 003: For Submission of Sewerage and Sanitary Plumbing Works (Rev. No.: 1) | Sanitary plumbing works shall be submitted by registered Professional Engineers with Practising Certificate in the Mechanical or Civil disciplines. Septic tanks and sewerage treatment plant including associated structural works shall be submitted by registered Professional Engineers with Practising Certificate in the Civil discipline only. |
71 | Mengemukakan Pelan "Sanitary and Plumbing" WJ.4.1985.1653 |
BEM Lembaga Jurutera Malaysia |
Peraturan dan Kaedah | Arkib | Mengemukakan Pelan "Sanitary and Plumbing" (Ref. No.: (81) dlm. LJM 28 Jld 2) | Sanitary plumbing works shall be submitted by registered Professional Engineers with Practising Certificate in the Mechanical or Civil disciplines. Septic tanks and sewerage treatment plant including associated structural works shall be submitted by registered Professional Engineers with Practising Certificate in the Civil discipline only. |
72 | Circular No. 5/2005: General Advice On Giving Of Second Opinion WJ.4.2005.1650 |
BEM Lembaga Jurutera Malaysia |
Peraturan dan Kaedah | Berkuatkuasa | Circular No. 5/2005: General Advice On Giving Of Second Opinion (Rev. No.: 0) | It is not common for an engineer to offer to a project owner unsolicited suggestion or proposal on the design which has been, or is being, carried out by another engineer already appointed by the owner to be the consulting engineer for the project. Quite commonly, such suggestion or proposal deals with the choice of engineering system (structural, geotechnical, etc.) or the so-called… |
73 | Circular No. 002: Continuing Professional Development (CPD) Requirements (Rev. No. 0) WJ.4.2017.1646 |
BEM Lembaga Jurutera Malaysia |
Peraturan dan Kaedah | Arkib | Continuing Professional Development (CPD) Requirements (Rev. No.: 0) | The BEM in performing its functions under Section 4(1)(ec) of Act 138 Registration of Engineers Act 1967 (Revised up to 2015) has caused a mandatory Continuing Professional Development (CPD) Programme to be undertaken by all Registered Professional Engineers with Practising Certificates, Registered Professional Engineers and Registered Inspectors of Works. This Circular states the… |
74 | Circular No. 002: Continuing Professional Development (CPD) Requirements (Rev. No. 1) WJ.4.2021.1643 |
BEM Lembaga Jurutera Malaysia |
Peraturan dan Kaedah | Berkuatkuasa | Continuing Professional Development (CPD) Requirements (Rev. No.: 1) | The BEM in performing its functions under Section 4(1)(ec) of Act 138 Registration of Engineers Act 1967 (Revised up to 2015) has caused a mandatory Continuing Professional Development (CPD) Programme to be undertaken by all Registered Professional Engineers with Practising Certificates, Registered Professional Engineers and Registered Inspectors of Works. This Circular… |
75 | Circular No. 3/2005: Guidelines for Code of Professional Conduct WJ.4.2004.1640 |
BEM Lembaga Jurutera Malaysia |
Peraturan dan Kaedah | Arkib | Code of Professional Conduct (Rev. No.: 0) | Guidelines of code of professional conduct. |
76 | Circular No. 001: Code of Conduct of Registered Person WJ.4.2016.1637 |
BEM Lembaga Jurutera Malaysia |
Peraturan dan Kaedah | Berkuatkuasa | Code of Conduct of Registered Person (Rev. No.: 1) | This Code of Conduct is in addition to Part IV, Code of Conduct of the Registration of Engineers Regulations 1990. |
77 | SURAT PEKELILING CIDB BIL. 6/2023 - PEKELILING PENSTRUKTURAN DAN PENETAPAN SYARAT PENDAFTARAN KONTRAKTOR FASILITI WC.1.2024.1485 |
CIDB Lembaga Pembangunan Industri Pembinaan |
Garis Panduan | Berkuatkuasa | Versi Pertama | SURAT PEKELILING CIDB BIL. 6/2023 - PEKELILING PENSTRUKTURAN DAN PENETAPAN SYARAT PENDAFTARAN KONTRAKTOR FASILITI |
78 | Status Reports on Applications to Local Authorities - GC No.4/1997 WA.1.2006.1482 |
LAM Lembaga Arkitek Malaysia |
Garis Panduan | Berkuatkuasa | 1 | The Board wishes to refer to its General Circular No. 4/1997 dated 9 December 1997 on the requirements to submit to the Board every 6 months a report on all applications submitted to the local authorities for approval. The required information is as shown in the Forms A1 and A2 as stipulated. |
79 | Guidelines on Advertising by Architects - GC No.3/1997 WA.1.1997.1479 |
LAM Lembaga Arkitek Malaysia |
Garis Panduan | Berkuatkuasa | 1 | These guidelines are issued pursuant to the provisions in the Code of Conduct for Architects under the Architects Rules 1996 to elaborate on and provide guidance to Architects on various activities which may be deemed to be described as “advertising". |
80 | Notification to the Board of a Change in Address (Building Draughtsmen) - GC No.2/1989 WA.1.1989.1476 |
LAM Lembaga Arkitek Malaysia |
Garis Panduan | Berkuatkuasa | 1 | All registered Building Draughtsmen are reminded that under Section 23 of the Architects Act 1967, they are required to inform the Board of any change of their business addresses. |