Menyenaraikan 301 hingga 320 daripada 401 dokumen yang dijumpai.
Bil. Tajuk Dokumen Terbitan Kluster Status Versi Ringkasan, Lampiran, dan Pautan
301 Use of Standard Rubber Stamp by Professional Architects (GC No.2/2009) - Revised 2016

WA.1.2016.633
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 The Board of Architects Malaysia had amended the Architects Act in 2015. In compliance to the recent amendments, the term "Professional Architect" has been replaced with the term "Architect".

302 ARCHITECT RULES 1996 (Amendment 2015) and ARCHITECT (SCALE OF MINIMUM FEE) RULES 2010 (GC No.1/2017)

WA.1.2017.630
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This GC is issued to remind all Architects:

On the compliance to Architects Rules 1996, Third Schedule [Rule 29] - Conditions of Engagement of an Architect [Sub-rule 29(1)].

On the compliance to the Architects (Scale of Minimum Fees) Rules 2010.

303 Guidelines on the Third Schedule of the Standard Sale and Purchase Agreement for Land and Building (GC No.2/2017)

WA.1.2017.627
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 The Ministry of Housing and Local Government had, on 1 June 2015, gazetted the Housing Development (Control and Licensing) (Amendment) Regulations 2015 [P.U. (A)106/2015] which shall be deemed to have come into operation on 1 July 2015.

304 Survey Form for the Architectural Services Industry (GC No.3/2017)

WA.1.2017.624
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This GC is issued to inform all ACP on the submission of the Survey Form which can be downloaded from the LAM's Website to the Board.

305 UNIFORM BUILDING BY-LAWS 1984 BY LAW 258 - FAILURE OF BUILDINGS (GC No.4/2017)

WA.1.2017.621
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This GC is issued to inform all registered members on the requirements and responsibilities of the principal submitting person (PSP) or submitting person (SP) under by-law 258 (1) of the Uniform Building By-laws 1984.

306 ARCHITECT'S ADDITIONAL SCOPE OF SERVICES FOR CERTIFICATION UNDER STRATA MANAGEMENT ACT 2013 (ACT 757) FOR STRATIFIED DEVELOPMENT (GC No.5/2017)

WA.1.2017.618
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This GC is issued to advised all Architects in their role as a principal submitting person (PSP), under the present regulations to certify the drawings prepared by a Licensed Land Surveyor for the purpose of filing of schedule of parcels.

307 ONLINE RENEWAL OF REGISTRATION (GC No.1/2018)

WA.1.2018.615
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This GC is issued to inform all registered members on the requirements when submitting the Renewal Registration Form.

308 ARCHITECT'S CERTIFICATION AND CHARGES (GC No.1/20219)

WA.1.2019.612
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This GC is issued to advise all Architects, in implementing their duties as an Architect appointed by a developer for any development that requires certifications by the Architects, they are entitled to certification charges as per 'Schedule 1' of this Circular.

309 Architect's Notification and Certification for Completion of Super Structurestage in a Stratified Development (GC No.2/2019)

WA.1.2019.609
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This GC is issued to advise all Architects in their role as a Principal Submitting Person (PSP) in a stratified development, that they are required under the present regulations to certify the completion of super structure stage (SSS) prior to submission of application for subdivision of a building or land by a Licensed Land Surveyors.

310 Submission of Building Plans by Architects to the Local Authorities (GC No.1/2020)

WA.1.2020.601
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 A joint Committee had been established between the Board of Architect Malaysia (BAM) and the Board of Engineers Malaysia (BEM) to review and to streamline the Appendices A, B and C with regards to submission of building plans by Architects to the local authorities. The review and streamlining took into consideration of the changes in the building typology and development trends.

311 Amendments to the Architects Rules 1996 (GC No.1/2023)

WA.1.2023.589
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This General Circular is issued to inform all registered members that the Architects Rules 1996had recently been amended. The amendments had been gazetted and come into force on 1st October 2022.

312 Pre-Qualification of Contractor For the Proposed Construction and completion of Infrastructure, Building and Public Realm (Phase 3) at Tun Razak Exchange ("TRX)

WC.2.2023.586
CIDB Lembaga Pembangunan Industri Pembinaan

Pengurusan Dasar Umum Berkuatkuasa TERBUKA Pre-Qualification of Contractor For the Proposed Construction and completion of Infrastructure, Building and Public Realm (Phase 3) at Tun Razak Exchange ("TRX)



313 Pindaan kepada Kaedah-Kaedah Arkitek 1996 (PA Bil.1/2023)

WA.1.2023.583
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 Pekeliling Am ini dikeluarkan untuk memaklumkan semua ahli berdaftar bahawa Kaedah-Kaedah Arkitek 1996 telah dipinda. Pindaan tersebut telah diwartakan dan mula berkuatkuasa pada 1 Oktober 2022.

314 Garispanduan mengenai Praktis Perundingan Seni Bina (PA Bil.2/2023)

WA.1.2023.572
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 Pekeliling Am ini dikeluarkan untuk memaklumkan semua Arkitek berdaftar dengan Lembaga Arkitek Malaysia (Lembaga) bahawa Kaedah 30A(3) telah diliputi di bawah pindaan Kaedah-Kaedah Arkitek 1996 yang telah diwartakan dan mula berkuatkuasa pada 1 Oktober 2022.

“(3) Dalam hal suatu pertubuhan perbadanan yang didaftarkan sebagai praktis perundingan seni bina yang mempunyai pengarah…

315 PERINTAH LEMBAA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (PENGENAAN LEVI) 2021

WC.1.2022.569
CIDB Lembaga Pembangunan Industri Pembinaan

Garis Panduan Berkuatkuasa TERBUKA PERINTAH LEMBAA PEMBANGUNAN INDUSTRI PEMBINAAN MALAYSIA (PENGENAAN LEVI) 2021



316 TUNTUTAN UJIAN PENGESANAN COVID-19 DI FASILITI SWASTA OLEH PEGAWAI PERKHIDMATAN AWAM PERSEKUTUAN ATAS URUSAN TUGAS RASMI

WK.5.2021.566
KKR Kementerian Kerja Raya, BK Bahagian Kewangan

Pengurusan dan Pentadbiran Umum Arkib 1.0 Surat edaran berkaitan tuntutan pengesanan Covid-19 di fasiliti swasta oleh Pegawai Perkhidmatan Awam Persekutuan atas urusan tugas rasmi yang perlu dihantar ke Bahagian Kewangan, Kementerian Kerja Raya untuk kelulusan.

317 Guidelines on Architectural Consultancy Practice (GC No.2/2023)

WA.1.2023.563
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This General Circular is issued to inform all registered Architects with the Board of Architects Malaysia (the Board) that Rule 30A(3) has been incorporated under the amendment of Architects Rules 1996 which was gazetted and enforced on 1 October 2022.

“(3) In the case of a body corporate registered as an architectural consultancy practice having a single director, the director…

318 Garispanduan mengenai Surat Pelepasan (PA Bil.3/2023)

WA.1.2023.560
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 Pekeliling Am ini menggantikan Pekeliling Am Bil 2/2007 semasa mengenai Garis Panduan di atas.

319 Guidelines on Letter of Release (GC No.3/2023)

WA.1.2023.557
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This General Circular replaces the current General Circular No. 2/2007 pertaining to the above Guidelines.

320 PEMILIHAN AGENSI PENGEMBARA BAGI WARAN PENERBANGAN UDARA AWAM (WPUA)

WK.5.2021.554
KKR Kementerian Kerja Raya, BK Bahagian Kewangan

Pengurusan dan Pentadbiran Umum Berkuatkuasa 1.0 Surat edaran berkaitan pemilihan agensi pengembara bagi WPUA ditentukan secara penggiliran bagi mengelak berlakunya kecenderungan pemilihan agensi pengembara yang sama.