Menyenaraikan 81 hingga 100 daripada 144 dokumen yang dijumpai.
Bil. Tajuk Dokumen Terbitan Kluster Status Versi Ringkasan, Lampiran, dan Pautan
81 PEKELILING BIL. 2/2008 : PROGRAM PEMBANGUNAN KONTRAKTOR SECARA BERTERUSAN CONTRACTOR CONTINOUS DEVELOPMENT PROGRAM (CCD)

WC.1.2008.1015
CIDB Lembaga Pembangunan Industri Pembinaan

Garis Panduan Berkuatkuasa Versi Pertama PEKELILING BIL. 2/2008: PROGRAM PEMBANGUNAN KONTRAKTOR SECARA BERTERUSAN CONTRACTOR CONTINOUS DEVELOPMENT PROGRAM (CCD)

82 KEPERLUAN PROSEDUR PENDAFTARAN KONTRAKTOR & MANUAL PENGGUNA

WC.1.2018.1012
CIDB Lembaga Pembangunan Industri Pembinaan

Garis Panduan Berkuatkuasa Cetakan Kedua Tahun 2018 KEPERLUAN PROSEDUR PENDAFTARAN KONTRAKTOR & MANUAL PENGGUNA

83 Pekeliling Pembangunan Kontraktor CIDB Bil 1/2008 – Program Integriti

WC.1.2008.1009
CIDB Lembaga Pembangunan Industri Pembinaan

Garis Panduan Berkuatkuasa Versi Pertama Pekeliling Pembangunan Kontraktor CIDB Bil 1/2008 – Program Integriti

84 Competency Management System (CMS) Kursus Integriti dan Kod Etika Kontraktor V1.0

WC.1.2017.1006
CIDB Lembaga Pembangunan Industri Pembinaan

Garis Panduan Berkuatkuasa Cetakan Pertama Tahun 2017 Competency Management System (CMS) Kursus Integriti dan Kod Etika Kontraktor V1.0

85 PANDUAN PERLAKSANAAN KURSUS SICW & TINDAKAN TATATERTIB

WC.1.2017.1003
CIDB Lembaga Pembangunan Industri Pembinaan

Garis Panduan Berkuatkuasa Kemaskini Tahun 2017 PANDUAN PERLAKSANAAN KURSUS SICW & TINDAKAN TATATERTIB

86 Pekeliling CIDB Bil 1/2022 - Pemakluman pengenaan Caj untuk proses membuka sekatan perintah Lembaga Pembangunan Industri Pembinaan Malaysia

WC.1.2023.646
CIDB Lembaga Pembangunan Industri Pembinaan

Garis Panduan Berkuatkuasa TERBUKA Pekeliling CIDB Bil 1/2022 - Pemakluman pengenaan Caj untuk proses membuka sekatan perintah Lembaga Pembangunan Industri Pembinaan Malaysia




87 Pekeliing CIDB Bil 2/2022 - Pemakluman Pengenaan Sekatan dan Caj Pentadbiran bagi proses membuka sekatan di dalam Sistem Centralized Information Management System (CIMS) CIDB

WC.1.2022.643
CIDB Lembaga Pembangunan Industri Pembinaan

Garis Panduan Berkuatkuasa TERBUKA Pekeliing CIDB Bil 2/2022 - Pemakluman Pengenaan Sekatan dan Caj Pentadbiran bagi proses membuka sekatan di dalam Sistem Centralized Information Management System (CIMS) CIDB



88 Pekeliling CIDB Bil 2/2023 - Pemakluman Penstrukturan Pendaftaran Kontraktor Asing

WC.1.2023.640
CIDB Lembaga Pembangunan Industri Pembinaan

Garis Panduan Berkuatkuasa TERBUKA Pekeliling CIDB Bil 2/2023 - Pemakluman Penstrukturan Pendaftaran Kontraktor Asing



89 Pekeliling CIDB Bil 3/2023 - Pemakluman Penetapan Kelayakan Pengurus Projek Binaan yang Menandatangani Borang G berdasarkan Undang-Undang kecil Bangunan Seragam (UKBS) 1984 (PINDAAN 2021)

WC.1.2023.637
CIDB Lembaga Pembangunan Industri Pembinaan

Garis Panduan Berkuatkuasa TERBUKA Pekeliling CIDB Bil 3/2023 - Pemakluman Penetapan Kelayakan Pengurus Projek Binaan yang Menandatangani Borang G berdasarkan Undang-Undang kecil Bangunan Seragam (UKBS) 1984 (PINDAAN 2021)



90 Use of Standard Rubber Stamp by Professional Architects (GC No.2/2009) - Revised 2016

WA.1.2016.633
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 The Board of Architects Malaysia had amended the Architects Act in 2015. In compliance to the recent amendments, the term "Professional Architect" has been replaced with the term "Architect".

91 ARCHITECT RULES 1996 (Amendment 2015) and ARCHITECT (SCALE OF MINIMUM FEE) RULES 2010 (GC No.1/2017)

WA.1.2017.630
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This GC is issued to remind all Architects:

On the compliance to Architects Rules 1996, Third Schedule [Rule 29] - Conditions of Engagement of an Architect [Sub-rule 29(1)].

On the compliance to the Architects (Scale of Minimum Fees) Rules 2010.

92 Guidelines on the Third Schedule of the Standard Sale and Purchase Agreement for Land and Building (GC No.2/2017)

WA.1.2017.627
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 The Ministry of Housing and Local Government had, on 1 June 2015, gazetted the Housing Development (Control and Licensing) (Amendment) Regulations 2015 [P.U. (A)106/2015] which shall be deemed to have come into operation on 1 July 2015.

93 Survey Form for the Architectural Services Industry (GC No.3/2017)

WA.1.2017.624
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This GC is issued to inform all ACP on the submission of the Survey Form which can be downloaded from the LAM's Website to the Board.

94 UNIFORM BUILDING BY-LAWS 1984 BY LAW 258 - FAILURE OF BUILDINGS (GC No.4/2017)

WA.1.2017.621
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This GC is issued to inform all registered members on the requirements and responsibilities of the principal submitting person (PSP) or submitting person (SP) under by-law 258 (1) of the Uniform Building By-laws 1984.

95 ARCHITECT'S ADDITIONAL SCOPE OF SERVICES FOR CERTIFICATION UNDER STRATA MANAGEMENT ACT 2013 (ACT 757) FOR STRATIFIED DEVELOPMENT (GC No.5/2017)

WA.1.2017.618
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This GC is issued to advised all Architects in their role as a principal submitting person (PSP), under the present regulations to certify the drawings prepared by a Licensed Land Surveyor for the purpose of filing of schedule of parcels.

96 ONLINE RENEWAL OF REGISTRATION (GC No.1/2018)

WA.1.2018.615
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This GC is issued to inform all registered members on the requirements when submitting the Renewal Registration Form.

97 ARCHITECT'S CERTIFICATION AND CHARGES (GC No.1/20219)

WA.1.2019.612
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This GC is issued to advise all Architects, in implementing their duties as an Architect appointed by a developer for any development that requires certifications by the Architects, they are entitled to certification charges as per 'Schedule 1' of this Circular.

98 Architect's Notification and Certification for Completion of Super Structurestage in a Stratified Development (GC No.2/2019)

WA.1.2019.609
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This GC is issued to advise all Architects in their role as a Principal Submitting Person (PSP) in a stratified development, that they are required under the present regulations to certify the completion of super structure stage (SSS) prior to submission of application for subdivision of a building or land by a Licensed Land Surveyors.

99 Submission of Building Plans by Architects to the Local Authorities (GC No.1/2020)

WA.1.2020.601
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 A joint Committee had been established between the Board of Architect Malaysia (BAM) and the Board of Engineers Malaysia (BEM) to review and to streamline the Appendices A, B and C with regards to submission of building plans by Architects to the local authorities. The review and streamlining took into consideration of the changes in the building typology and development trends.

100 Amendments to the Architects Rules 1996 (GC No.1/2023)

WA.1.2023.589
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This General Circular is issued to inform all registered members that the Architects Rules 1996had recently been amended. The amendments had been gazetted and come into force on 1st October 2022.