Menyenaraikan 21 hingga 40 daripada 146 dokumen yang dijumpai.
Bil. Tajuk Dokumen Terbitan Kluster Status Versi Ringkasan, Lampiran, dan Pautan
21 GUIDELINES ON THE THIRD SCHEDULE [CLAUSE 4(1)] OF THE STANDARD SALE AND PURCHASE AGREEMENT FOR LAND AND BUILDING/ GUIDELINES ON THE THIRD SCHEDULE [CLAUSE 4(1)] OF THE STANDARD SALE AND PURCHASE AGREEMENT FOR SUB-DIVIDED BUILDING

WA.1.2005.1434
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 The Guidelines which have been issued vide the Board’s General Circular No. 4/2003 dated 15 December 2003 have taken into consideration the amendments to the Housing Development (Control and Licensing) Regulations 1989 which came into force from 1 December 2002. All Professional Architects have been advised to be familiar with
these Guidelines before certifying works in respect of housing…

22 Guidelines on Architectural Consultancy Practices - GC No.2/2004

WA.1.2004.1431
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 An Act to amend the Architects Act 1967 cited as the Architects (Amendment) Act 2002 introduced, among others, a new section 7B pertaining to the registration of a body corporate providing architectural consultancy services, professional engineering services and/or quantity surveying services (hereinafter referred to as ‘multi-disciplinary practices’ or ‘MDP’).

23 GUIDELINES ON LETTER OF RELEASE - GC No.2/2007

WA.1.2007.1428
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This General Circular replaces the current General Circular No. 1/1998 pertaining to the above Guidelines.

A Professional Architect on being approached or instructed to proceed with professional work for which he knows or can ascertain by making reasonable enquiries that another Professional Architect has been engaged by the registered proprietor (Note 1) and/or his bona-fide agent…

24 Use of Standard Rubber Stamp by Interior Designers - GC No.6/2010

WA.1.2010.1425
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 The Board of Architects Malaysia (LAM) has decided that all Interior Designers shall use a standard rubber stamp specified by LAM for the purpose of standardization.

25 Guidelines on Branch Office and Associated Practice - GC No.3/2010

WA.1.2010.1422
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 Paragraph 2(2) of the Code of Professional Conduct for Professional Architects under Second Schedule to the Architects Rules 1996 stipulates the following :
“A Professional Architect shall not establish a branch office unless it is operated in accordance with the guidelines or circulars issued by the Board.”

26 Guidelines on Issuance of FORM F1 (Partial Certificate of Completion and Compliance) - GC No.2/2010

WA.1.2010.1419
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This GC is issued to provide guidance to Professional Architects on the issuance of Form F1 i.e. the Partial Certificate of Completion and Compliance.

27 Registration of Interior Design Consultancy Practice - GC No.1/2010

WA.1.2010.1416
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This GC is issued as guidelines pertaining to the formation and registration of interior design consultancy practice.

28 GUIDELINES ON THE THIRD SCHEDULE [CLAUSE 4(1)] OF THE STANDARD SALE AND PURCHASE AGREEMENT FOR LAND AND BUILDING/GUIDELINES ON THE THIRD SCHEDULE [CLAUSE 4(1)] OF THE STANDARD SALE AND PURCHASE AGREEMENT FOR SUB-DIVIDED BUILDING

WA.1.2008.1413
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 The Ministry of Housing and Local Government had, on 17 June 2008, gazetted the Housing Development (Control and Licensing) (Amendment) Regulations 2008 which shall be deemed to have come into operation on 1 December 2007. The recent Regulation was gazetted to rectify the error in the previous Housing Development (Control and Licensing) (Amendment) Regulations 2007.

29 Guidelines on Architectural Competition - GC No.2/2005 (Revised 2008)

WA.1.2008.1410
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 These Guidelines are issued pursuant to the provisions of the Code of Professional Conduct for Professional Architects to elaborate and provide guidance relating to architectural competitions.

30 PROVISION OF FREE OR VIRTUALLY FREE SERVICES - GC No.1/1997

WA.1.1997.1405
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 It has come to the Board's attention recently that there have been a number of instances of Architects having been invited to submit conceptual or other proposals for development projects either without any cost or obligation whatsoever on the part of the party wishing to obtain proposal. The Board feels it advisable to issue this Advisory for the information and guidance of Architects.

31 SUBMISSION OF PLANS BY ARCHITECTS AND ENGINEERS - GC No.4/1989

WA.1.1989.1402
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This is to inform all Architects that a Joint Committee has recently been established between the Board of Architects Malaysia (BAM) and the Board of Engineers Malaysia (BEM) to discuss the above. Discussions will be centred mainly on the list of works in 'Appendix C' of the letter issued by the Joint BAM-BEM Committee to all local authorities in 1979. For your information, the said…

32 GUIDELINES FOR IN-HOUSE or SALARIED ARCHITECTS - GC No.4/1987 (Revised 1991)

WA.1.1987.1399
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 2 This Circular is issued for the information and guidance of all Architects in salaried positions whether in the employment of architectural firms or in agencies in both the public and private sectors or in companies holding positions as "in-house Architects". (Revised 30 March 1991)

33 REMINDER to Architects on the Architects (Scale of Minimum Fees) Rules 1986 and Adequacy of Professional Services provided to Third Parties - GC No.3/1987

WA.1.1987.1396
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 All Architects are reminded that the Architects (Scale of Minimum Fees) Rules 1986 (hereinafer referred to as "the Scale of Fees") which came into force on 21 August 1986 must be followed.

34 USAGE OF THE TERM “CHARTERED ARCHITECT” - GC No.1/1986

WA.1.1986.1393
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 Further to the Board's General Circular No. 4/1982 on the Guidelines for Names of Architectural Firms and Letterheads, I am directed to inform all registered Architects on the Board's stand pertaining to the usage of the term "Chartered" in naming or describing a practice. The word "Chartered" is of no significance and relevance in the Malaysian context and its usage…

35 SELLING SIGNATURES - GC No.3/1984

WA.1.1984.1390
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 It has come to the Board's attention that over the last few years the influx of foreign architects into Malaysia to practise is on the increase. It is also noticed that the majority of these architects were initially brought in and engaged by the building owners. The implication is that the engagement of local registered Architects is secondary and that they play a secondary role merely to…

36 JOINT PRACTICE WITH FOREIGN ARCHITECTS - GC No.3/1982

WA.1.1982.1387
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 The attention of all Architects is drawn to the increasing incidence of architects from other countries making approaches to Architects in Malaysia. This is usually either to meet the requirements of their engagement or to comply with the law.

37 Architects (Scale of Minimum Fees) Rules 2010

WA.1.2010.1384
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 Minimum Scale of Fees May 2010

38 CERTIFICATE OF COMPLETION AND COMPLIANCE (CHECKLIST) - GC No.2/2000

WA.1.2000.1381
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This is to inform all Architects and registered Building Draughtsmen that the Ministry of Housing and Local Government has recently amended the Uniform Building By-Laws (UBBL) 1984 to allow the implementation of the following:
(a) individually built detached house to be exempted from the requirements of obtaining a Certificate of Fitness for Occupation (CFO);
(b) for other buildings…

39 IMPORTANCE OF CONTINUITY OF REGISTRATION -GC No.1/2000

WA.1.2000.1378
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 All persons registered by the Board should note the importance of ensuring that their registration by the Board is maintained continuously without interruption. The Board has recently obtained legal advice on this matter as there have been instances that the Board has had to address this problem.

40 CONTINUING PROFESSIONAL DEVELOPMENT for registered Building Draughtsmen - GC No.4/2004

WA.1.2004.1375
LAM Lembaga Arkitek Malaysia

Garis Panduan Berkuatkuasa 1 This General Circular replaces General Circular No. 3/2003 dated 25 January 2003 and shall be read in conjunction with the Guidelines on Continuing Professional Development.