Menyenaraikan 41 hingga 47 daripada 47 dokumen yang dijumpai.
Bil. | Tajuk Dokumen | Terbitan | Kluster | Status | Versi | Ringkasan, Lampiran, dan Pautan |
---|---|---|---|---|---|---|
41 | Standard Technical Specification Lift System WJ.3.2017.531 |
JKR Jabatan Kerja Raya, CKM Cawangan Kejuruteraan Mekanikal |
Standard dan Piawaian | Berkuatkuasa | 2017 | All particulars of the Lift System as regards no. of lift, type, contract load, contract speed, travel of lift, number of floors and entrances served, lift car dimensions and area and position of Machine Rooms are as indicated in the Schedule of Equipment and/or tender drawing. |
42 | Internal Cold Water and Sanitary Plumbing System WJ.3.2017.525 |
JKR Jabatan Kerja Raya, CKM Cawangan Kejuruteraan Mekanikal |
Standard dan Piawaian | Berkuatkuasa | 2017 | Internal Cold Water and Sanitary Plumbing System The work to be performed under this contract shall comprise, but not limited to the supply, delivery, installation, testing and commissioning and maintenance of the following principal services and the associated works and items. |
43 | Spesifikasi Teknikal Piawai: Sistem Bekalan Air Sejuk Dalaman dan Perpaipan Sanitari WJ.3.2011.517 |
JKR Jabatan Kerja Raya, CKM Cawangan Kejuruteraan Mekanikal |
Standard dan Piawaian | Berkuatkuasa | 2011 | Spesifikasi Teknikal Piawai: Sistem Bekalan Air Sejuk Dalaman dan Perpaipan Sanitari The work to be performed under this contract shall comprise, but not limited to the supply, delivery, installation, testing and commissioning and maintenance of the following principal services and the associated minors works and items. |
44 | KKR-PK-05 PROSEDUR PENYEDIAAN CADANGAN ANGGARAN PERBELANJAAN MENGURUS WK.3.2023.501 |
KKR Kementerian Kerja Raya, BK Bahagian Kewangan |
Standard dan Piawaian | Berkuatkuasa | 1 | Prosedur ini digunapakai oleh Kementerian Kerja Raya di dalam menyediakan Cadangan Anggaran Perbelanjaan Mengurus |
45 | KKR-PK-06 PROSEDUR BAYARAN WK.3.2023.492 |
KKR Kementerian Kerja Raya, BK Bahagian Kewangan |
Standard dan Piawaian | Berkuatkuasa | 3 | Prosedur ini digunapakai oleh semua Pusat Tanggungjawab (PTJ) di bawah Kementerian Kerja Raya iaitu Bahagian Perancang Jalan, Bahagian Khidmat Pengurusan, Bahagian Kewangan, Bahagian Pembangunan dan Penswastaan, Bahagian Akaun dan Bahagian Pengurusan Fasiliti. |
46 | KKR-PK-27 KELULUSAN KEMUDAHAN PERUBATAN WK.3.2023.471 |
KKR Kementerian Kerja Raya, BK Bahagian Kewangan |
Standard dan Piawaian | Berkuatkuasa | 1.0 | Prosedur ini digunapakai oleh semua Bahagian di bawah Kementerian Kerja Raya yang merangkumi proses penerimaan, permohonan, semakan dan perakuan serta kelulusan Kemudahan Perubatan. |
47 | CIS 21 : 2018 - READY MIXED CONCRETE : PRODUCTION, CONFORMITY, TRANSPORTATION AND DELIVERY CRITERIA FOR PRODUCERS WC.3.2018.326 |
CIDB Lembaga Pembangunan Industri Pembinaan |
Standard dan Piawaian | Berkuatkuasa | Cetakan Pertama | CIS 21:2018 - READY MIXED CONCRETE : PRODUCTION, CONFORMITY, TRANSPORTATION AND DELIVERY CRITERIA FOR PRODUCERS |