Menyenaraikan 1 hingga 20 daripada 144 dokumen yang dijumpai.
Bil. | Tajuk Dokumen | Terbitan | Kluster | Status | Versi | Ringkasan, Lampiran, dan Pautan |
---|---|---|---|---|---|---|
1 | GUIDELINE TO IHL ON USAGE OF ETAC/BEM STANDARDS WITH RESPECT TO MQA PROGRAMME STANDARD ASSOCIATED WITH THE ENGINEERING TECHNOLOGY EDUCATION IN PROGRAMMES WJ.1.2019.4375 |
BEM Lembaga Jurutera Malaysia |
Garis Panduan | Berkuatkuasa | 2 | GUIDELINE TO IHL ON USAGE OF ETAC/BEM STANDARDS WITH RESPECT TO MQA PROGRAMME STANDARD ASSOCIATED WITH THE ENGINEERING TECHNOLOGY EDUCATION IN PROGRAMMES |
2 | GUIDELINES NO. 003 - THE ROLE AND RESPONSIBILITY OF PROFESSIONAL ENGINEERS IN EARTHWORKS AND BUILDINGS DESIGNED BY DIFFERENT SUBMITTING PERSONS WJ.1.2017.4283 |
BEM Lembaga Jurutera Malaysia |
Garis Panduan | Berkuatkuasa | 0 | THE ROLE AND RESPONSIBILITY OF PROFESSIONAL ENGINEERS IN EARTHWORKS AND BUILDINGS DESIGNED BY DIFFERENT SUBMITTING PERSONS (TEMPORARY WORKS) |
3 | GUIDELINES NO. 003 - THE ROLE AND RESPONSIBILITY OF PROFESSIONAL ENGINEERS IN EARTHWORKS AND BUILDINGS DESIGNED BY DIFFERENT SUBMITTING PERSONS WJ.1.2017.4280 |
BEM Lembaga Jurutera Malaysia |
Garis Panduan | Berkuatkuasa | 0 | THE ROLE AND RESPONSIBILITY OF PROFESSIONAL ENGINEERS IN EARTHWORKS AND BUILDINGS DESIGNED BY DIFFERENT SUBMITTING PERSONS |
4 | GUIDELINE NO. 002-INDUSTIRALISED BUILDING SYSTEM(IBS) WORKS AND IT'S IMPACT ON SCALE OF FEES WJ.1.2016.4277 |
BEM Lembaga Jurutera Malaysia |
Garis Panduan | Berkuatkuasa | 0 | INDUSTIRALISED BUILDING SYSTEM(IBS) WORKS AND IT'S IMPACT ON SCALE OF FEES |
5 | GUIDELINES NO. 006 - GENERAL GUIDELINES ON INTEGRITY MANAGEMENT SYSTEM FOR ENGINEERING CONSULTANCY PRACTICE WJ.1.2022.4270 |
BEM Lembaga Jurutera Malaysia |
Garis Panduan | Berkuatkuasa | 0 | GENERAL GUIDELINES ON INTEGRITY MANAGEMENT SYSTEM FOR ENGINEERING CONSULTANCY PRACTICE |
6 | GUIDELINES NO. 007 - GUIDELINES ON ETHICAL USAGE OF DIGITALISATION TECHNOLOGY FOR ECPS AND REGISTERED PERSON WJ.1.2023.4267 |
BEM Lembaga Jurutera Malaysia |
Garis Panduan | Berkuatkuasa | 0 | GUIDELINES ON ETHICAL USAGE OF DIGITALISATION TECHNOLOGY FOR ECPS AND REGISTERED PERSON |
7 | GUIDELINES NO. 005 - GUIDING PRINCIPLES ON TEACHING-LEARNING AND ASSESSMENT IMPLEMENTATION DURING COVID-19 PANDEMIC | BEM Lembaga Jurutera Malaysia |
Garis Panduan | Berkuatkuasa | 0 | GUIDING PRINCIPLES ON TEACHING-LEARNING AND ASSESSMENT IMPLEMENTATION DURING COVID-19 PANDEMIC |
8 | GUIDELINES NO. 004 - GENERAL GUIDELINES FOR PROFESSIONAL CIVIL ENGINEERS UNDERTAKING ENGINEERING SURVEY WORKS WJ.1.2018.4263 |
BEM Lembaga Jurutera Malaysia |
Garis Panduan | Berkuatkuasa | 1 | GENERAL GUIDELINES FOR PROFESSIONAL CIVIL ENGINEERS UNDERTAKING ENGINEERING SURVEY WORKS |
9 | Interim Guide on IDENTIFYING, PRIORITISING AND TREATING HAZARDOUS LOCATIONS ON ROADS IN MALAYSIA | JKR Jabatan Kerja Raya |
Garis Panduan | Berkuatkuasa | 1995 | This interim guide provides information specifically for Malaysia and sets out a standard methodology for analysing accident data to help identify the most hazardous locations select appropriate remedial measures, and evaluate this action. It is my hope that this Guide will be useful to all who are involved in the road safety field, helping them to channel limited resources in a more efficient… |
10 | SURAT EDARAN PENGUATKUASAAN ARAHAN TIDAK MEMBENARKAN PENERIMAAN POST-DATED CHEQUE DAN CEK PERSENDIRIAN BAGI TRANSAKSI TERIMAAN KERAJAAN DI KEMENTERIAN KERJA RAYA (KKR) DAN JABATAN KERJA RAYA (JKR) | KKR Kementerian Kerja Raya, BA Bahagian Akaun |
Garis Panduan | Berkuatkuasa | AP 76(a) dan APANM Bil.3/2019 | Penguatkuasaan arahan untuk tidak membenarkan penerimaan "Post-Date Cheque" dan cek persendirian bagi transaksi terimaan kerajaan di semua PTJ Kementerian Kerja Raya dan Jabatan Kerja Raya. |
11 | GARIS PANDUAN PROSES PULANGAN BALIK ATAU PELARASAN AKAUN DEPOSIT WANG JAMINAN PELAKSANAAN (WJP) | KKR Kementerian Kerja Raya, BA Bahagian Akaun |
Garis Panduan | Berkuatkuasa | 6.5 & 6.7 | Garis Panduan Proses Pulangan Balik atau Pelarasan Akaun Deposit Wang Jaminan Pelaksanaan (WJP) . |
12 | SURAT PEKELILING CIDB BIL. 6/2023 - PEKELILING PENSTRUKTURAN DAN PENETAPAN SYARAT PENDAFTARAN KONTRAKTOR FASILITI WC.1.2024.1485 |
CIDB Lembaga Pembangunan Industri Pembinaan |
Garis Panduan | Berkuatkuasa | Versi Pertama | SURAT PEKELILING CIDB BIL. 6/2023 - PEKELILING PENSTRUKTURAN DAN PENETAPAN SYARAT PENDAFTARAN KONTRAKTOR FASILITI |
13 | Status Reports on Applications to Local Authorities - GC No.4/1997 WA.1.2006.1482 |
LAM Lembaga Arkitek Malaysia |
Garis Panduan | Berkuatkuasa | 1 | The Board wishes to refer to its General Circular No. 4/1997 dated 9 December 1997 on the requirements to submit to the Board every 6 months a report on all applications submitted to the local authorities for approval. The required information is as shown in the Forms A1 and A2 as stipulated. |
14 | Guidelines on Advertising by Architects - GC No.3/1997 WA.1.1997.1479 |
LAM Lembaga Arkitek Malaysia |
Garis Panduan | Berkuatkuasa | 1 | These guidelines are issued pursuant to the provisions in the Code of Conduct for Architects under the Architects Rules 1996 to elaborate on and provide guidance to Architects on various activities which may be deemed to be described as “advertising". |
15 | Notification to the Board of a Change in Address (Building Draughtsmen) - GC No.2/1989 WA.1.1989.1476 |
LAM Lembaga Arkitek Malaysia |
Garis Panduan | Berkuatkuasa | 1 | All registered Building Draughtsmen are reminded that under Section 23 of the Architects Act 1967, they are required to inform the Board of any change of their business addresses. |
16 | Notification to the Board of a Change in Address - GC No.1/1989 WA.1.1989.1473 |
LAM Lembaga Arkitek Malaysia |
Garis Panduan | Berkuatkuasa | 1 | All registered Architects and Architectural Graduates are reminded that under Section 14 of the Architects Act 1967, they are required to inform the Board of any change of their business addresses. |
17 | Certification or Signing of Plans by registered Building Draughtsmen - GC No.5/1988 WA.1.1988.1470 |
LAM Lembaga Arkitek Malaysia |
Garis Panduan | Berkuatkuasa | 1 | All registered Building Draughtsmen are hereby informed that the following requirements of the Board shall be applicable with immediate effect : |
18 | Reminder to Registered Building Draughtsmen on Certificates of Progress of Works - GC No.1/1988 WA.1.1988.1467 |
LAM Lembaga Arkitek Malaysia |
Garis Panduan | Berkuatkuasa | 1 | This Circular is issued to all registered Building Draughtsmen following the increase in the number of complaints received by the Board lately pertaining to wrongful certification of the stage of completion of projects by registered Building Draughtsmen. |
19 | Clarification on The Provision of Section 24(5)(i) and Section 24(5) (ii) of The Architects Act 1967 - GC No.6/1986 WA.1.1986.1464 |
LAM Lembaga Arkitek Malaysia |
Garis Panduan | Berkuatkuasa | 1 | This Circular is issued in response to the queries received by the Board of Architects Malaysia relating to the submission of plans by registered Building Draughtsmen to the various local building authorities for approval. The most common query relates to the provisions under Sections 24(5) (i) and 24(5) (ii) of the Architects Act, 1967 (Revised 1973). |
20 | Registration of Building Draughtsmen and Their Areas of Operation - GC No.5/1986 WA.1.1986.1461 |
LAM Lembaga Arkitek Malaysia |
Garis Panduan | Berkuatkuasa | 1 | Applications for registration as registered Building Draughtsmen under Section 22 of the Architects Act 1967 (Revised 1973). |